top of page

Photovoltaic Systems for SMEs in Coal Regions

Under the “Regional Development” Programme 2021–2027, Priority 4 “Fair Transition,” grant funding is available for micro, small, and medium-sized enterprises (SMEs) to install photovoltaic systems (PV) with energy storage batteries in regions affected by the coal industry.


Who Can Apply

Eligible are micro, small, and medium-sized enterprises that:

  • Are registered under the Commercial Act, the Cooperatives Act, or equivalent legislation in an EU/EEA member state;

  • Operate in the following areas:

    • Districts: Kyustendil, Pernik, Stara Zagora

    • Municipalities: Nova Zagora, Yambol, Simeonovgrad, Harmanli, Topolovgrad, Dimitrovgrad, Haskovo, Elhovo, Sliven, and Tundzha

  • Apply for support for their main economic activity for 2024 (Component 1);

  • Have net sales revenue for 2024 of at least:

    • Micro enterprises – BGN 100,000

    • Small enterprises – BGN 250,000

    • Medium enterprises – BGN 800,000


Ineligible Applicants

  • Enterprises whose main activity in 2024 is in: agriculture, forestry, fisheries, food processing, essential oils, cork, or tobacco;

  • Companies with already approved projects and contracts under previous PV system funding procedures.


What Is Funded

Funding is provided through two components:


Component 1 – PV systems for self-consumption (up to 1 MW)

For enterprises to reduce electricity costs, including:

  • PV panels

  • Storage batteries

Eligible in the districts of Pernik, Kyustendil, Stara Zagora, and the listed municipalities.

Component 2 – PV systems for electricity sale (up to 5 MW)

For enterprises to produce and sell electricity to the grid.Eligible in Stara Zagora district and the listed municipalities.


Eligible Activities

  • Design of PV systems;

  • Supply and installation of:

    • PV modules

    • Storage batteries

    • Inverters (devices converting DC from panels into AC for the grid)

    • Supporting structures

  • Connection to the electricity grid;

  • Author and construction supervision;

  • Commissioning of the system;

  • Permits, fees, and project management.


Important Requirements:

  • Systems must include both PV modules and batteries;

  • Batteries must store energy for at least 1 hour at 100% capacity (or 2 hours at 50% capacity, or 4 hours at 25% capacity);

  • Installation must be carried out by companies with certified staff listed by the Executive Agency for Sustainable Energy Development (EASED / АУЕР).


Funding

Total Budget

BGN 141,769,243 (~EUR 72,485,463), allocated by regions and components.


Grant Amount per Project

Component 1:

  • Micro and small enterprises – BGN 100,000 to 500,000

  • Medium enterprises – BGN 100,000 to 3,000,000

Component 2:

  • Micro – BGN 300,000 to 6,500,000

  • Small – BGN 400,000 to 6,500,000

  • Medium – BGN 500,000 to 6,500,000


Funding Intensity

  • De minimis aid (simplified state aid): 65% for all beneficiaries

  • Regional state aid:

    • PV modules: micro & small – 65%, medium – 55%

    • Batteries: micro & small – 50%, medium – 40%


Project Duration

Up to 24 months.


How to Apply

Project proposals must be submitted online through the ISUN 2020 platform.


Funding Authority

Programme: Regional Development 2021–2027Priority: Fair TransitionProcedure: BG16FFPR003-4.011 – “Support for photovoltaic systems and installations in micro, small, and medium-sized enterprises”


Application Deadline

24 March 2026, 17:00

dmitko_bg_httpss.mj_edited.jpg

Consult us

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

Do you have an idea for a project, but aren't sure where to start?
Contact us for a free consultation today!

0886 123 456

bottom of page